Home > Technical Informations

  Language
 


1.Dam Body
    1-1. Dam Body Specifications
    1.2. Diversion System
           1-2-1. Pre- cofferdam & cofferdam
           1-2-2. Specifications of the Cofferdam
           1-2-3. Downstream Dyke
           1-2-4. Culvert
           1-2-5. Intake Structure
           1-2-6. Outlet Structure
           1-2-7. Bottom Outlet
    1-3. Watertightening System of the Foundation
    1-4. Inspection & Access Galleries
    1-5. Instrumentations
    1-6. Spillway
    1-6-1. Specifications
    1-6-2. Spillway inlet Structure
    1-6-3. Energy Dissipation System
    1-7. Borrow Pits
2. Hydroelectric power plant
     2-1. General specifications
     2-2. Power plant Equipment
          • 2-2-1. Cranes
          • 2-2-2. Draft Tube Closure Gates
          • 2-2-3. Inlet Valves
          • 2-2-4. Weight of the Butterfly Valves Main Parts
          • 2-2-5. Turbines
          • 2-2-6. Governor System
          • 2-2-7. Generators
          • 2-2-8. Excitation System
          • 2-2-9. Rectifier
          • 2-2-10. Field Installation
          • 2-2-11. Busduct
          • 2-2-12. Switches
          • 2-2-13. Arrester
          • 2-2-14. Transformers
          • 2-2-15. Unit Protection System
          • 2-2-16. Station Control System
          • 2-2-17. DC & UPS
          • 2-2-18. DC & UPS low Voltage Equipment
          • 2-2-19. Alternate current (AC)
          • 2-2-20. Main Transformer
          • 2-2-21. Switchyard
          • 2-2-22. Transmission Lines
     2-3. Power- house Building
     2-4. Power- house tail race
     2-5. Power Tunnels
3. Dasht-e Abbas pressure Tunnel
     3-1. Specifications
     3-2. Tunnel Intake Structures
     3-3. Tunnel Outlet Structure
4. Access Roads and Bridges
 

Table of Contents

General Informations
Technical Informations
Especial Informations
Essays Collection
Infos & News
Related Sites
Contact us
Karkheh Audio/Video
Weather Information